Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing

Customization: Available
After-sales Service: 1 Year
Warranty: One Year

Products Details

  • Overview
  • Company Profile
  • After Sales Service
  • You May Like
  • FAQ
Overview

Basic Info.

Model NO.
XPG
Condition
New
Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
Country of Origin
China
Packaging
Wood Carton
Brand
Maoyuanfeng
Electronics
World Famous Brand
Transport Package
Wood Carton
Trademark
MYF
Origin
China
Production Capacity
180 Units

Product Description

Product Profile:
  The batch off cooling machine is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.

Our Machine Advantage:
  there are two structure types: overhead and floor-standing types, whose hanging racks are vertically turning with compulsive cooling. The rubber strip hanging bar adopts step by step cylinder or motor-reducer for driving. It consists of mainframe and electrical control system. The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting device, hanging strip cooling, auto wig wag section, weighing, handrail, platform and supporting bracket etc. The electrical control system consists of main control cabinets, and there're emergency stop device in key areas.

  Clients can choose high or low disposition according to the practical requirements. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio≤100mm;there are three working positions for auto entering and outputting of material tray; auto rubber collecting device; auto cutter device; it has high automatization and can realize nobody operating.
  
The marking device with letter block auto changing function.
  The slitting device can cut the rubber sheet to become 2/3/4/6 even width strips automatically.
  The solution liquid volume on the rubber sheet surface can be controlled by an air knife. 
   The rubber sheet from the dipping tank to the rack bar conveyor through a special leading device to become very smooth and no trouble.
   With the auto pick-up device for leading rubber sheet from the cooling rack bar to take-out  Conveyor automatically.
   With the special designed auto stacking device from the folding rubber sheet to pallet very tidy.
   The pallet storing station can store 8~10 pallets with shifting-out function. 
   Auto lifter for transporting stacked pallets to the upper floor automatically.
   Auto sampling, auto cutting, auto weighting , metal detector etc.

Specification Technology Parameter:
        Model XPG-600 XPG-800 XPG-900
Max Rubber Sheet Width 600 800 900
The Thickness Of Rubber Sheet (mm)
 
4-10 4-10 6-12
Linear Speed of Taking-in Sheet 11~22m/min 0~26m/min 3~35m/min
Axial Fan 0.37KW  5760m3/h 0.37KW  5760m3/h 0.37KW  5760m3/h
Swing range and frequency 1.3m 10-16/min 1.3m 10-16/min 1.3m 10-16/min
Rubber strip temperature after cooling ≤Room temperature+5ºC ≤Room temperature+5ºC  
≤Room temperature+5ºC
Speed-adjusting frequency motor of lifting device XWD5.5-1/23 XWD5.5-1/23 XWD5.5-1/23
Speed-adjusting frequency motor of rubber swing device XWD1.1-5-1/87 XWD1.1-5-1/87 XWD1.1-5-1/87
Rubber bar pitch 160 or 101.6 160 or 101.6 160 or 101.6
Max hanging height of rubber strip 1400mm 1400mm 1400mm

FQA-Problems of customer concern:
About machine performance quality

1.       Q: How to guarantee the quality of outsourcing parts?
          AFirst choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       QWhich brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba,ABB
Customer can specify the brand.
3.       QWhich PLC:
          ASiemens, Omron, Mitsubishi
4.       Q: How to control the quality?
          AThere are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        QWhen the guide engineer arrive at customer's factory?
           A If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        QWhat is the warranty time?
           A2 years after machine arrived at factory
2.        QHow to solve the problem?
            AWithin one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.


Machine Mechanical Details:
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
Machine Electric Details:
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
Foreign Customers:
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing



Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing

Company Profile

 

Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.

Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.

Our products:
Tire making machines:

Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.

Conveyor belt making machines:
Vulcanizing press.

Rubber mat making machines
Inner tube making machines
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing

 

After Sales Service

Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.

Service
Plant engineering                    - We provide FREE layout design for new plant.
Supplier Integrity                    - 24/7 working machines, extremely reliable.
Plant Installation Support      - Installation&commissioning service.
Spare Parts                              - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization     - Overseas engineers available.
Training                                    - We provide FREE training for new plant.
Raw Materials                          - Raw material support exported from China.

You May Like

Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing

 

 

FAQ

 

1.       Q: How to guarantee the quality of outsourcing parts?
          AFirst choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       QWhich brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.       QWhich PLC:
          ASiemens, Omron, Mitsubishi
4.       Q: How to control the quality?
           AThere are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        QWhen the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        QWhat is the warranty time?
           A:  2 years after machine arrived at factory
2.        QHow to solve the problem?
           AWithin one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Foreign Customers Visit Factory:
Batch off Cooling Machine with ISO Certificate for Rubber Product Manufacturing
Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China


 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours