- Overview
- PD CUSTOMISED SOLUTIONS
- Product Description
- Recommend Products
- Feedback
- Company Profile
Basic Info.
Product Description
Power, distribution and instrument transformers
Partial discharge testing is an essential, proven tool that can locate and identify flaws in the insulation of cables, bushings, windings, tap changers and a myriad of other assets and accessories. In the early stage of ageing of insulated materials, detection of deteriorating performance may be difficult to detect by traditional test methods. However partial discharge still occurs and can be monitored its source identified. Weshine offers a wide range of test equipment for onsite on- and off-line tests and PD monitoring, as well as PD acceptance testers for factory testing laboratories.
Switchgear
At the end of a production line, or when commissioning gas insulated switchgears and lines (GIS, GIL), partial discharge tests are used to confirm the integrity of the insulation system. Additionally, on-line PD measurements that use acoustic and UHF sensors help keep aged GIS equipment in service, which is essential to reduce the increasing number of these assets that have reached the end of their projected lifespans. PD measurements that use acoustic and UHF sensors offer further benefits. In the case of acoustic measurements, so-called 'bouncing particles' provide high sensitivity, whereas external ring antennas, window sensors and embedded sensors enable survey measurements to be taken and partial discharge activity in the UHF range to be monitored. Due to these benefits, Weshine has created instruments that combine UHF and accoustic measurements.
MV, HV, EHV Cables and accessories
As polyethylene is a 'non-forgiving' form of insulation, close attention needs to be paid to any partial discharge activity during factory testing, commissioning and online servicing. When performing on-site PD measurements, the equipment used must cover the needs of an ageing polymeric cable distribution network as well as cope with the increasing application of polyethene extra high voltage cables.
Bushing, Spacers, Insulators, etc
Quality control is essential when it comes to pre-testing the accessories of high voltage transformers, switchgears or other important assets. Indeed, this increasing need for quality control has pushed the responsibility onto sub-suppliers and their quality management systems. As a result, manufacturing sites have built their own partial discharge test benches for the final acceptance testing of these essential assets. It's also common practice for them to provide test reports to customers showing the guarantee level of internal PD and the applied standards. Weshine help design complete test benches to required specifications. We work with multiple partners in the design of test rooms and shop floor automation and the modularity of our equipment enables us to customise designs according to our customer's needs.
Other insulating materials and electronic components
Not only do Weshine offer test equipment for the standard range of applications, we also offer customised solutions for a range of other applications that haven't been listed.
PRODUCT INFORMATION | |||
Product Name | HANDHELD PARTIAL DISCHARGE TESTER | ||
Model Number | VSPD Series | Certificates | CE; EMC; LVD; ISO; |
Test Range | 0.1 pC ~ 100,000 pC | Test Channels | 4 |
Spectrogram Mode | PRPS, PRPD, WAVE | ||
Typical Application | Power transformer, GIS, switchgear, cable… | ||
Sensors Type | * UHF Sensors and Ultrasonic PD Sensors(40 kHz) for GIS * TEV Sensors and Non-contact Ultrasonic PD Sensors for Switchgear * HFCT Sensors and Ultrasonic PD Sensors(80 kHz) for Transformer |